Under Armour Project Apollo

Baltimore, MD
Owner Under Armour
General Contractor Davis Construction, LLC
Schedule Duration May 2015 - November 2015
Contract Value $4,100,000.00
Architect/Engineer Hope Furrer

Project Overview

Under Armour Project Apollo

Bell performed the mechanical and plumbing component of this 173,000 SF project, which entailed the renovation and build-out of a former Sam’s Club to accommodate Under Armour’s Finance and IT offices at site of the old Port Covington Shopping Center.

The new office building, designed by architecture firm Bohlin Cywinski Jackson, includes a 350-person auditorium; 29 conference rooms with audiovisual technology; the IT help desk; open stairwells; collaborative workspaces, and double-height perimeter event spaces.

Bell installed:

  •  (2) Air cooled chillers totaling 450 Tons
  • (14) Air Handling Units totaling 140,000 cfm
  •  (9) Ductless Split AC Units
  •   HVAC Pumps, Fans, and associated equipment
  •   Temperature Controls