Bell performed the mechanical, plumbing and process piping scope of work for the construction of an approximately 50,000 square foot Controlled Industrial Facility (CIF) located in Portsmouth, VA. The newly completed CIF supports maintenance and repair services for Navy vessels. The facility incorporates specialized systems, equipment, materials, and construction designed to contain, handle, and process liquid waste. It also includes a Controlled Area (with a high bay work area and smaller rooms), a two-story administrative Support Area, and an Enclosed Storage Area (ESA). The Controlled Areas are built of specialized concrete construction and contain stainless steel tanks, equipment, and systems for processing liquid waste.
The Bell Company successfully out ran (and out walked) the sun in a race against Melanoma.
The Richmond Style Weekly cover story from April 7, 2020, “Still Building – A look at some major construction projects that continue to rise around Richmond despite the world setback of COVID-19” , highlights the VCU Adult Outpatient Pavilion and the General Assembly Building projects. As we are providing mechanical subcontracting services at both sites, it continues to be business as usual for Bell. Click to read the article