Bell performed the mechanical, plumbing and process piping scope of work for the construction of an approximately 50,000 square foot Controlled Industrial Facility (CIF) located in Portsmouth, VA. The newly completed CIF supports maintenance and repair services for Navy vessels. The facility incorporates specialized systems, equipment, materials, and construction designed to contain, handle, and process liquid waste. It also includes a Controlled Area (with a high bay work area and smaller rooms), a two-story administrative Support Area, and an Enclosed Storage Area (ESA). The Controlled Areas are built of specialized concrete construction and contain stainless steel tanks, equipment, and systems for processing liquid waste.
Check out the Time-Lapse EarthCam at 22 WestEdge in Charleston, South Carolina. Bell is providing Mechanical and Plumbing subcontracting services to Trident Construction for this 160,214 square foot, eight-story office building. Bell's team at 22 WestEdge is led by Project Manager Rob Klink, Assistant Project Manager Carl Hitchcock, and Project Superintentent Matthew McCants.